9 GB
Charging the rechargeable batteries
with a solar cell
Press the ON / OFF switch 11 into the OFF
position and red LED indicator of ON / OFF
switch 11 extinguish at the same time, so
the charging process is not influenced by
the light being switched on.
Insert the solar cable plug 14 into the solar
electricity socket 8 of the spotlight 10 .
Position the solar cell 12 as described in
section “Mounting the solar cell 12 ”.
Note: With steady exposure to sunlight,
the rechargeable battery is fully charged
after 4 to 6 days. The duration of the charg-
ing process depends on the charge state of
the rechargeable battery as well as the
quality of the exposure to sunlight.
Assembly
Note: Remove all packaging materials from the
product.
Before mounting, decide where you want to
mount the solar cell 12 and the spotlight 10 .
The solar cell 12 and the spotlight 10 can be
mounted independently of each other, but after
being mounted must be connected with the ap-
prox. 5 m long cable of the solar cell
12
.
After
the mounting, lay the cable so it is not subject to
any mechanical stresses. Use typical installation
material such as cable clamps or conduit to fasten
the cable, to prevent damage to the insulation.
Note: The included mounting material is suitable
for ordinary solid concrete or masonry construc-
tion. Other wall substrates may require other
fastening materials. Seek specialist advice if
necessary.
Mounting the spotlight
Make sure you will not be drilling into electrical,
gas or water lines inside the wall. Use a power
drill to drill the holes into the brick wall. Always
observe all safety instructions for the power drill
in the manual for the power drill. Death or injury
due to electric shock may otherwise result.
When selecting the mounting location for the
spotlight 10 , pay attention to the following:
Make sure the spotlight 10 illuminates the
desired area. You can move the spotlight
10
.
Make sure the motion detector 9 covers
the desired area. The motion detector 9
has a maximum coverage range of 12 m,
with a coverage angle of about 180°
(depending on the mounting height – a
height of 1.8–2.5 m is ideal) (see Fig. D).
Make sure the motion detector 9 is not
illuminated at night by street lighting. This
can influence its functioning.
Unscrew locking screws 4 to detach the
mounting bracket 3 from the spotlight 10 .
Utilize the mounting bracket
3
as a template
for making the position of the two outer drill
holes.
Then drill these holes and attach the mount-
ing bracket 3 using the supplied dowels 1
and screws 2.
Now attach the spotlight 10 to the mounting
bracket 3 using the previously removed
locking screws 4, spring washers 5 and
flat washers 6. Please make sure that the
spring washers 5 and flat washers 6 are
located as fig A.